Peikko Benelux delivered DELTABEAM® Composite Beams, Column Shoes, Anchor Bolts and Fastening Plates to the new factory of Ausnutria Hyproca in Heerenveen.
Use of DELTABEAM® Composite Beams together with precast columns with HPKM® Column Shoes proved to be a fast and easy construction method. For the precast columns there was no need for temporary braces. The contractor was also satisfied with the fact that the DELTABEAM® did not require any additional fire-protection at the site.