City Electrical Factors (CEF) IT and Marketing Office, Durham, UK

  • Typ obiektu:
  • Budynki biurowe
Pełny ekran Zamknij Street View

For the new CEF Date, IT and Marketing Centre the architects Faulkner Brown wanted a “technologically cutting-edge building”

A kit of parts approach was taken and 90nr DELTABEAM®s were incorporated into the design along with Peikko Column Shoes & Anchor bolts. DELTABEAM® Composite Beams providing a slim floor and flat soffit also interfaced with precast floor units which incorporated combined heating & cooling system, creating a Thermally Active Building System (TABS). The frame was delivered the 11-week contractual period.

The new CEF headquarters also secured the 2019 RIBA Northeast Building of the Year Award.

Czytaj więcej down-arrow.png

Informacje o projekcie

Wielkość projektu:
2100 m2
Kondygnacje:
2
Deweloper:
CEF Ltd
Generalny Wykonawca:
PCE Ltd
Biuro konstrukcyjne:
Curtins
Architekt:
FaulknerBrowns
Rok realizacji dostaw:
2016
Zakończenie budowy:
2017