Ministry of Higher Education, Riyadh, Saudi Arabia

  • Typ obiektu:
  • Budynki biurowe
Pełny ekran Zamknij

The new head office of the Ministry of Higher Education (MOHE) in Riyadh has become the first governmental property that fully integrates smart technology in Saudi Arabia. Peikko has facilitated the construction of this remarkable building with numerous column shoes, anchor bolts, and lifting and fastening items. 

MOHE was recently certified by Smart Buildings Institute, a non-profit organisation aimed to encourage smart building technology.

All systems of the building are integrated to a single platform, allowing users to benefit from its services, simultaneously creating a comfortable work environment that would reflect positively on all employees, while reducing significant energy consumption. This project represents a new concept to elevate services in which technology can positively affect different aspects of human life, while increasing productivity.

Through a central system at the MOHE headquarters, HVAC and building management, along with an internal and external monitoring system supported by CCTV cameras and access controls, are interlinked with one another. Integrating these systems into a single platform will allow the building operators and occupants to have better control and accurate real-time information on how the building and all subsystems are functioning, therefore enabling a ‘smart’ environment.

The building is equipped with advanced applications including open-vendor integration platform that seamlessly integrates IP, lighting controls, fire alarm system, computerised maintenance management system, elevator controls, digital signage and energy-profile tracking applications.

The systems have successfully reduced electricity consumption from lighting and central air-conditioning through control units which work on the basis of need.

Source: www.constructionweekonline.com

Czytaj więcej down-arrow.png

Informacje o projekcie

Biuro konstrukcyjne:
Al Salem Johnson Controls
Zakład prefabrykacji:
AlRashid Abetong Co. Ltd.
Rok realizacji dostaw:
2010
Zakończenie budowy:
2011

Kontakt

Radovan Endel

Radovan Endel

General Manager

[email protected]