Prime Tower, Zürich, Switzerland

  • Typ obiektu:
  • Budynki biurowe
Pełny ekran Zamknij Street View

The 126-metre-high office tower features retail floor space and a bar situated on the ground floor, publicly accessible restaurant with bar and lounge on the top floor, as well as conference centre on the second-highest floor. Tenants primarily include clients from the upscale services sector. The building has received several environment labels for its sustainability and environmental design. Besides of main tower, the building complex includes three annex buildings with offices and retail.

Peikko provided the construction with lifting devices and the correspondent solution for closing holes in the desired color.

Informacje o projekcie

Wielkość projektu:
228000 m2
Kondygnacje:
36
Generalny Wykonawca:
Marti AG
Architekt:
Gigon/Guyer Architekten
Rok realizacji dostaw:
2010
Zakończenie budowy:
2010

Kontakt

Gregor Schabrun

Geschäftsführer

Tel. +33 (0)1 49 46 13 15
gregor.schabrun@peikko.com